FREQUENTLY ASKED

The questions we hear most.

Fencing, timelines, cost and the realities of building on the Northern Beaches. Straight answers from a builder working since 1968.

Fencing and the register

Safety and compliance.

What are the NSW pool fence rules?
A pool barrier must be at least 1.2 metres high, with any gap under it no more than 10 centimetres and no more than 10 centimetres between vertical bars. The gate must swing outward from the pool and be self-closing and self-latching, and a non-climbable zone must be kept clear around the fence. These come from the NSW Swimming Pools Act and Regulation.
Do I have to register my pool in NSW?
Yes. Every pool that can hold water deeper than 30 centimetres must be listed on the NSW Swimming Pool Register, recorded against the property. A certificate of compliance, once issued, is valid for three years.

Cost and value

What it comes down to.

What drives the cost of a concrete pool?
Mostly the site. Excavation and rock, slope and retaining, and access decide much of the figure before any finish is chosen. Size and depth, the interior finish, coping and surrounds, plant and automation, and the approvals pathway make up the rest. We explain each on our cost guide and quote a real figure after a site visit.
Should I choose concrete or fibreglass?
Concrete suits a bespoke design, a sloping or rocky block, and a pool meant to last the life of the home, since it can be any shape and is resurfaced rather than replaced. Fibreglass installs faster and costs less to start but comes in fixed moulded shapes. Our concrete vs fibreglass comparison weighs both in detail.

Build and timeline

How long and what happens.

How long does a concrete pool take to build?
Most residential builds run fourteen to twenty weeks from contract to handover, depending on access, soil and council approvals. Approvals typically take a few weeks, the shell and cure a few more, then coping, finish, plant and commissioning. Commercial timelines vary with the building program. Our process page sets out each stage.
How long does shotcrete take to cure?
A sprayed concrete shell sets within roughly seventy two hours and then cures over a longer period, from a couple of days of air-curing up to a few weeks as it reaches full strength. Coping, tiling and finishing follow the cure.

Northern Beaches sites

Slope, sandstone and access.

Can I build a pool on a sloping block?
Yes. A concrete pool is well suited to a slope because it is engineered and formed in place. Sloping sites often need retaining walls and structural engineering, which we design as part of the project. Slopes are common across Northern Beaches suburbs like Seaforth and Avalon.
What happens if you hit rock during excavation?
Sandstone sits close to the surface across much of the Northern Beaches, so we assess probable ground conditions before we start and tell you the risk up front. Where the dig is part rock and part soil, the shell is piered down to rock on the soft side to an engineer's design. Rock removal is the most common cause of a cost increase, which is why we flag it early.
Will I need a crane to get my pool in?
Not for concrete. A concrete pool is built where it sits, so there is no shell to lift. This is an advantage on tight or steep Northern Beaches blocks, where a fibreglass shell would often have to be craned over the house.
Can a concrete pool be built for coastal conditions?
Yes. Salt air and UV are part of building on this coast. A steel-reinforced concrete shell with the right interior, coping and sealing is engineered to live in that environment, which is why concrete has lasted on the Northern Beaches for decades.

Water and heating

Running the pool.

Is a saltwater or chlorine pool better?
A saltwater pool is still a chlorine pool. A chlorinator makes chlorine from dissolved salt rather than you adding it directly, which many owners find gentler on skin and eyes and easier to run day to day. We fit salt or mineral systems depending on the brief.
What are my pool heating options?
The common choices are solar, a heat pump, or gas. Solar is cheapest to run but depends on sun and roof area, a heat pump is efficient for regular year-round use, and gas heats fastest for occasional use. We size the heating to how you actually plan to use the pool.